Welcome To The Strikepoint Gold HUB On AGORACOM

Focused on the Rice Lake Gold Belt

Free
Message: Re: ...SKP...VS ..West Wind..

Jul 21, 2009 06:47PM

Jul 22, 2009 06:31AM

Jul 23, 2009 04:23PM

Jul 26, 2009 12:48PM

Jul 27, 2009 04:11PM

Jul 29, 2009 04:24PM

Aug 02, 2009 08:49PM
1
Aug 02, 2009 11:04PM
1
Aug 03, 2009 08:47AM
1
Aug 04, 2009 01:07PM
1
Aug 06, 2009 05:49PM

Aug 07, 2009 10:01AM
1
Aug 07, 2009 10:23AM
1
Aug 07, 2009 10:26AM
2
Aug 07, 2009 11:12AM

Aug 07, 2009 12:19PM

Aug 07, 2009 12:22PM

Aug 07, 2009 12:24PM

Aug 07, 2009 12:27PM
2
Aug 07, 2009 12:29PM
1
Aug 07, 2009 01:29PM

Aug 08, 2009 07:26PM

Aug 08, 2009 10:51PM
1
Aug 09, 2009 06:27PM
1
Aug 10, 2009 09:50AM
2
Aug 10, 2009 10:08AM

Aug 10, 2009 10:33AM

Aug 10, 2009 11:15AM

Aug 10, 2009 11:53AM
1
Aug 10, 2009 11:53AM
1
Aug 10, 2009 12:44PM
1
Aug 11, 2009 09:27PM

Re: ..Coming Our Way

in response to ..Coming Our Way by traps7
posted on Jul 29, 09 09:31PM

.Drilling is also targeting the next axis or pathway target located approximately 0.5 kilometre to the west of the Hinge deposits. The currently known Hinge zones are located approximately 1.5 kilometres to the northeast of San Gold's operating Rice Lake mine and mill, and are fully accessible by San Gold's private road...THE Strike Point JV with San, sits 2.4 Kil North East/West from Sans Head Frame, and Sans drills are on our pathway, .here is an example of what Sans drills are heading to.

MINERAL INVENTORY FILE NO.
282
____________________________________...
PRODUCT
GOLD
NTS AREA
52M4SE
REF.
AU 12
____________________________________...
NAME OF PROPERTY
VANSON MINE (Syndicate Nos. 9, 10)
OWNER OF OPERATOR ADDRESS
1985 - Walter N. Baker
15 Kirkland Street
Swastika, ON P0K 1T0
OBJECT LOCATED
Shaft
MINING DIVISION
Winnipeg
Latitude
51° 02.8’
Longitude
95° 39.2’
Uncertainty (m)
50 m
UTM Zone
_____
Easting
_______
Northing
_______
L.S./Quarter Section
___
Section
___
Township
24
Range
13 EPM
DESCRIPTION OF DEPOSIT
Gold is found in northwest trending shear zones that dip steeply north. The southern part of the property is underlain by Precambrian metasediments. Granitic rocks outcrop in the northern sector. Foliation in the granite follows the contact between it and the metasediments. The shaft, as well as most exploratory work, was located in the metasediments.
The metasediments are quartzites and greenstones. The latter contain chlorite, hornblende, epidote, and quartz, and are often altered and sheared. Quartz veins in the greenstones are discontinuous and varying in width. They are primarily lenticular. Aplite dykes are sometimes associated with the greenstone lenses.
Ore was taken from two veins. The shaft was sunk on Vein No. 1. Vein No.\2, intersected on the 69 m level in the shaft, gave some high assays, but overall assays were erratic. Iron sulphides were found in another vein on this level. A fault intersects the shaft at a depth of 38 m. Some of the quartz veins widen with depth.
ASSOCIATED MINERALS OR PRODUCTS OF VALUE
N/A
HISTORY OF EXPLORATION AND DEVELOPMENT
The deposit is located about 2.4 km northeast of the San Antonio Mine, north of the Wanipigow (Hole) River and 1.6 km north of Provincial Road No.\304. Early staking of the property was as follows:

1924 Syndicate No. 9 38054 E. Arnovitch
- assigned to R.W. Killey in 1927
1924 Syndicate No. 10 38066 S. Bubis
- assigned to R.W. Rilley in 1925.

The claims were explored and developed by a syndicate. A shaft on Syndicate No. 9 was begun in 1926 and 1927. In 1935 this shaft was deepened and expanded until it reached a depth of 148 m. In 1932 Vanson Gold Mines Limited was formed and took control of Syndicate No. 9 and 10, along with several other claims. A 23 tonne capacity mill was installed in 1933. This mill proved unsatisfactory and was replaced by a 2-stamp mill with a capacity of about 16.3 tonnes per day. Newspaper reports mention the ore was running $11 per tonne and some gold was produced (Manitoba Mines Branch). Some trenching was done on other Syndicate claims. Spectacular high grade ore was reported in 1932 and 1934 (Manitoba Mines Branch, Company Report 1932). Early in 1934 Vanson Manitoba Gold Mines Limited took control of Vanson Gold Mines Limited.
By February of 1935 the shaft was completed. It had four levels, of which the 69 m and the 145 m levels were most developed. Channel samples on the 69 m level of the No. 2 vein yielded assays of trace to 27.09 g/tonne (0.79 oz/ton) gold. Cross-cuts were made on all levels. John Houston observed visible gold all the way down the shaft. He also recommended more exploration before any further development (Manitoba Mines Branch).
A company town was built; and equipment was converted from steam to electricity. Diamond drilling totalling 277 m was done from the bottom of the shaft. Small isolated high grade occurrences were noted by J.A. Reid in his report to the company, however he did not think they were of economic importance (Manitoba Mines Branch).
Samples from the 145 m level gave assay values of less than 0.69 g/tonne (0.02 oz/ton) gold. The drill hole in the bottom of the shaft gave similar values.
Houston and Reid did not feel the property could be economically developed, and operations were discontinued in 1935. In July 1953, the claims were cancelled.
In 1953 John Donner and G. Fontane staked Rita 21 (W 22022) and Rita 26 (W 20027), respectively. Ownership was transferred to Art Callari in 1969. The claims lapsed in 1974.
In 1978 W. Baker and C.J. Baker staked W 46004 and CB 9591, respectively, over the deposit. Esso Resources Canada Limited acquired the property in 1980 and carried out geological mapping, line cutting, and prospecting in 1981. Ownership of the claims was transferred to W. Baker in 1985.
HISTORY OF PRODUCTION
Production Gold Est.
(Tonnes) g (oz.) Fineness Process
18 79.9 (2.57) 800 amalgamation in Tremain mill

Aug 12, 2009 09:35AM

Aug 12, 2009 09:40AM

Aug 12, 2009 09:43AM
1
Aug 12, 2009 09:45AM
Share
New Message
Please login to post a reply