Diamond Fields chrono vs Noront chrono repeat history??
posted on
Jan 26, 2008 05:57AM
NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)
Double Eagle : 2007 Diamond Drilling started on August 24, 2007 on company’s Double Eagle project in James Bay Lowlands. Double Eagle : 2007 Stock halted on Sept. 7, 2007 & on Sept. 10, 2007 Hole NOT-07-01 partial assay results gave 36 meters averaging 1.84% nickel, 1.53% copper Double Eagle : 2007 By December 2007 Noront has completed 5,047 meters of diamond drilling in 27 drill holes. Current drill results include 117 meters grading 4.1% nickel, 2.2% copper, 2.1 grams per tonne platinum, and 7.1 grams per tonne palladium beginning 7 meters below the surface. Double Eagle : 2008 Several airborne anomalies, with geophysical attributes similar to the Eagle One occurrence have been identified. These anomalies are located to the south and west of the Eagle One occurrence as well as to the northwest, all within 5 kilometers of Eagle One. Double Eagle : 2008 Drilling resumes with 2 more drills named “June” & “Jonny”