Well Hog, lets hope you're right! All the data, results, DD, releases, etc to this point, IMO would support what you're saying.
1st priority targets, when you add up all the depths from the 26 holes, add up to 11,900 M. I wonder how much more drilling they can do without another PP? Or will more drilling be required? I assume all 1st priority holes are in the present budget.
When you look at the Drill hole locations inside the targets, and I look at the Azimuth & Dip from Table 2-1 of the report, not sure I understand the direction they are planning, on some of the targets? They look all the same other than Hole 13 (target T5).
It'll be fun calculating once we see the 3D, and get the first set of results!