This is taken from NR prior to the fall drilling and then more IP was done and was succesful so next set of results should extend zone just a ? of grade
A down-hole IP (BHIP) survey was completed in February 2007. JVX Limited (Geophysical
Consulting firm) described the results as follows:
“The BHIP survey of the two boreholes on the Jacobus Property (SJ06-01 and SJ06-02)
proved very successful in confirming the continuation of a mineralized zone found in each
hole. Both chargeability and conductivity show a clear response of each mineralized zone
and the inversion models show a continuous zone connecting both holes”