No such message found

Solid foundations. New horizons.

Free
Message: Probe September 2014 Presentation.

Gene,

Some notable differences between the Sept and Aug presentations:

- The new colour scheme shows better the contrast between the high (>2.5gpt) and lower (>0.5gpt) grades.

- The HGZ underneath the lake (100%PRB) looks more and more appealing, showing a larger resource compared to that within the 50-50 JV (and the wedge)

- The blue box (dotted line) showing the expansion and infill winter drill program for 2015. From Figure 9, the box runs right up to the other shore where the cottages are located (another 500m, or so).

Just wondering how Dave would arrange the drilling...directional drilling from a spot far enough from the cottage (since this gets too far from the north shore)?

One option is to sit a drill on the larger island (of the 2) near The Narrows and drill away in various directions with a long drill. The other option would be to get an agreement from the lumber people and position the drills from the south shore and drill toward the NE. A third option would be a bit more daring: digging up a ramp to explore by drilling from underground. No sight, no noise, no complaint, hopefully.

Any comments on my speculations from any drilling experts out there?

goldhunter

Share
New Message
Please login to post a reply