Solid foundations. New horizons.

Free
Message: Re: TSX Venture Daily Bulletin - re: Placees

If Dave is going to book at least three to four drills to explore the BLH on a massive scale including ground geophysics,drillings at designated locations,plus IP surveys on the entire property to detect sulphide in the ground to complement arial surveys as well,25 millions will last about less than two years.That way,we can have uninterrupted works done plus continuous news float for a long time.

Share
New Message
Please login to post a reply