MD&A out
posted on
Dec 13, 2018 06:41PM
http://cloud.stockwatch.com/News/Sedardoc.pdf?docid=4208911
Based on current estimates, the BETonMACE trial is expected to be completed within the first half of calendar 2019 with third party adjudication of all MACE events anticipated to be available within two to three months past trial completion. Within this two to three month adjudication window, we believe the trial has the potential to accumulate over 270 events, adding to the power of the trial. The topline results of the study will be made available shortly thereafter.