Thanks dmastercard. The more we share the better off we all are IMO.
Further to my post... if emails fro Brian are correct and they have drilled 20 holes... and total 2009 drilling for GM and Golden Pond claim blocks total $615,000... that equates to an average of about $31,000 per hole... at a cost of about $50 per metre to drill... that equates to an average depth of about 620m per hole... of course this is on average... so maybe they have not drilled any deeper than previous (i.e. ~600m)... No idea... But IMO unlikely they have drilled all holes at same depth... likely some 300m, some 500m... and likely at least a few at 800m to 1000m... also, if they have received 10 holes and drilling is complete for the remaining 10... assays should not take that long... 8-10 days max... but then we have to wait for company to compile and interrpet of course.
Just trying to figure it all out...
red911