more pie in the sky economics.....what is the cost of installing power lines, and equipment over thousands of square miles, not cheap by any measure, an area the size of France....right of ways have to be forged, towers erected, enviormental concerns addressed, and of course, consent from the local populations....Canada has a 145 year suppy of Natural Gas, better to install a number of gas electrical plants, than run wires all over the swamp.