Here's another blurb from the MD&A dated May 15 2007.
"Drilling to date on this project has emphasized the Langmuir 2 North Zone and the Langmuir No. 1 Zone, with drilling concentrated near zones of previous production and extending outward from the old production areas. Exploration holes have, in addition, been drilled in the Langmuir South target area, and in several other geophysical and geochemical target areas to determine stratigraphy and to test for the presence of nickel sulphide mineralization.
Drilling of the Langmuir North Zone to date totals 8,495 meters in 63 diamond drill holes. This drilling is summarized in an NI43-101 report by Kian Jensen which was updated to December 31, 2007. That report is filed with SEDAR (as of February 27, 2007) and may be read there. Drilling has tested this zone in detail to 100 meters depth, with one hole penetrating substantially deeper, demonstrating continuation of the zone to greater depth to the north of previous production from the Langmuir Two shaft area. That zone is yet open, both to the north and to depth."