Developing Processes For The Low-Cost Manufacturing Of High Purity Silicon Metals For Next-Generation Lithium-ion Batteries

Achieved final critical milestones, completing a successful silicon pour

Sponsored
Message: Plant Size

 Hi Deslug1,

Thank you for the question.

The answer you seek is actually in the quote :

"The positive correlation between production yield, purity, and PUREVAPTM QRR reactor size is optimized with a 50 Tonne per year reactor;".

So yes, a 50 tonnes per year reactor is the minimum size required to achieve the optimum positive purity correlation... that we have started to mention in our November 1, 2017, release…

So after studies and tests, PyroGenesis engineers have come to the conclusion that we need a minimum 50 tonnes per year capacity to reach the target 90% production yield threshold... And what that implies is that above 50 TPA capacities, the positive correlation between production yield, and purity is stable so we gain nothing in that regard with a larger size plant.

So the answer is no we do need to have 4 - 50 TPA reactors to reach the 200 TPA.  At this time we have not yet fully estimated was is the optimum size of a commercial reactor, but primary models are that the capacity could easily exceed the 2,000 TPA threshold…

Regards,

Bernard Tourillon