The production test means we do not give up Australia but it means that we have to wait fo the well test from a long horizontal well with multi fracs. Can take some time and some money. This result will make a difference.
In unconventional Wattenberg Anadarko is producing about 600 bbl oil/day plus 1 MMcft/d per well. Or BPT produces and tested 2 MMcft/d from their unconventional vertical gas well
Fo is still fa away from that.