Re: Beetaloo pipeline
in response to
by
posted on
Feb 16, 2009 05:29PM
Developing large acreage positions of unconventional and conventional oil and gas resources
>Well site is at 16 27' 10" S. Lat and 133 46' 45" E. Long.
John, do you happen to have the co-ordinates of Petrohunters well? They seem to be having trouble locating it :)
From PetroHunters 10K
Beetaloo Basin Project. Sweetpea also has four exploration permits in the Northern Territory, comprising the Beetaloo Basin Project. In September 2007, Sweetpea drilled and cased one well the Shenandoah #1 to a total depth of 1,555 meters (4,740 feet) in the area covered by Exploration Permit (“EP”) 98 in the Beetaloo Basin. The test was a twin (50 meter distance) from the Balmain #1 well and was designed to test the Bessie Creek Formation at a depth of approximately 3,000 meters. The well was completed to the drilled depth of 1,555 meters and cased, in anticipation of later completing the well to the targeted total depth.
From Falcons prospectus:
The exploration permits that form the legal basis for the Beetaloo Basin Project require the drilling of eight new wells (one of which has already been drilled by Sweetpea, even though the well was lost before reaching its objective depth) and the acquisition of 800 kilometres of new seismic by December 31, 2009.