Re: Enough for 100 years? – Secrecy is abundant around the Mako gas field/Lanman
posted on
Feb 01, 2009 09:31AM
Developing large acreage positions of unconventional and conventional oil and gas resources
> I can't wait to find out whether they have the Box-on-Box system installed.
The rig is a box-on-box type, it is the hydraulic move system that is optional.
A box-on-box design means that "it enables efficient rig moves on
trucks. This can be particularly useful for European operations , where road
load rules can be strict."
A hydraulic move system would mean that the entire rig has some sort of movable system that allows it to move a short distance without being disassembled...a short distance meaning it stays on the same drilling pad.