Welcome to the Electrovaya Hub on AGORACOM

(Edit this message through the "fast facts" section)

Free
Message: Re: Timing
1
May 22, 2016 09:41AM

I don't think we can include Canada's production line....that too needs to be revamped. It's going to take 3 years at least to finish the lines in Germany. Something has changed with the design/chemistry of the product and the engineering has to be done (reason for high R&D). It's going to cost a lot more ....and that's why they have stalled the construction. So, to pay for the production lines.....they have to sell an already great product, even though they have a game changer in their back pocket. Hogey, your absolutely right about the energy density, they will not release details till a production line is finished....which makes sense. I've been involved in this construction kinda delay before (engineers are always thinking)...it's not bad unless the change in engineering causes an even bigger delay then expected. Let's hope they get Canadian government grants soon....so they can start construction in Canada too.

1
May 22, 2016 02:36PM
1
May 22, 2016 05:58PM

May 22, 2016 06:24PM
Share
New Message
Please login to post a reply