CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)
Great info Investorish! Thanks for sharing. Here's my comments:
The Panama project with the incomplete feasibility study appears to be Petaquilla (link here)
My guess at the 3 mines connecting to the NTL: Imperial Metal's Red Chris (under construction), Pretium's Brucejack?, and Schaft Creek?
The electricity costs in 2008 should be similar to 2012. The cost in 2008 was $0.0469/kWh. KSM's Preliminary Feasibility Study from June 2012 estimated costs at $0.047/kWh. Galore Creek's Preliminary Feasibility Study from July 2011 used $0.05/kWh. For comparison, Teck's QB2 project in Chile is estimating costs at $0.10/kWh.