Re: Timeline and delays
in response to
by
posted on
Feb 21, 2012 03:15PM
CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)
I want the cards on the table. There are only a few companies out there who've taken this long. They also included their most recent results into the FS. We seem to be reserving those incase we need something to do while we wait. If we don't have a deal (*as I contend we do) then they should get on with it at once.