Based on this NR: Sept 6th (almost 3 months ago)
The 3rd drill had arrived: ''The third diamond drill arrived at Schaft Creek over the week-end and will be used for combined geotechnical and exploration purposes. ''
410-411-412-413 Had been completed: Diamond Drilling Update:
Copper Fox is currently drilling DDH CF414-2011 and DDH CF415-2011. The four drill holes completed subsequent to DDH CF409-2011 intersected visible copper and molybdenite mineralization over variable core widths. Analytical results for these holes are pending.
They were drilling 414 and 415: Copper Fox is currently drilling DDH CF414-2011 and DDH CF415-2011.
=========
We received 411-412 Nov 15th
Should not be long for 412-413 (completed prior to sept 6th)
2011CF412 |
6360991
|
379380
|
962
|
63.7
|
90
|
-60°
|
Delineation Drilling/Geotechnical |
2011CF412B |
6360990
|
379381
|
962
|
636.1
|
90
|
-60°
|
Delineation Drilling/Geotechnical |
2011CF413 |
6360921
|
379654
|
1033
|
576.7
|
270
|
-64°
|
Delineation Drilling |
http://www.copperfoxmetals.com/s/Image.asp?i=maps/2010-2011-DDH-LOCATION.JPG&id=491395