Question for UC management
posted on
Nov 05, 2011 10:44PM
On March 14, 2011, UC communicated in a press release that a 6 hole program had been planned for the McFaulds #3 massive sulphide occurrence. The PR stated that unfortunately due to severe weather conditions and the unexpected earlier than scheduled departure of the drill crew the Company was able to complete only four of the intended holes which included a hole drilled on McFaulds #5 occurrence. The 4 holes that were completed were MCF-10-80, MCF-10-81, MCF-10-82 and MCF-10-83. On August 29, 2011, UC announced the drilling of 2 holes. Hole MCF-11-84 was collared 200 metres west of McFaulds Lake and hole MCF-11-85 was collared 1.34 kilometres west of hole MCF-11-84. Given the numbering sequence of these 2 holes being sequential to the first 4 holes announced buy UC on March 14, 2011, can the conclusion be made that holes MCF-11-84 and MCF-11-85 were the 2 holes that were missed during the 6 hole program that had been planned for the McFaulds #3 or were they also drilled at McFaulds #5? Please advise. Thank you.