It looks like in August, 2012 when we were sitting with, I think, approximately $2,000,000.00 in the treasury, an assessment was done on the property. The final cost of this was $38,095.87. So, for some reason, with the treasury dwindling away, there seemed to be a need to spend this exuberant amount on assessing the North Rim? Take a look at the helicopter expenses, etc. Seems a bit much to me,but then what do I know??Anway, I thought I’d post some info on it, looks like some familiar names associated with the project. It will be interesting to find out who picked up the claims.
Exploration Work type Comment Days Totals
Personnel (Name)* / Position Field Days (list actual days) Days Rate Subtotal*
James Thom / Project Geologist Aug 11 to Aug 25 10 $550.00 $5,500.00
Gerrard Gallisant / Propsector Aug 11 to Aug 25 10 $300.00 $3,000.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$8,500.00 $8,500.00
Office Studies List Personnel (note - Office onl Ho urs
Literature search $0.00 $0.00
Database compilation
Dorian Leslie (Dataprep,
georefernce, access maps) 4.0 $80.00 $320.00
Computer modelling $0.00 $0.00
Reprocessing of data $0.00 $0.00
General research $0.00 $0.00
Report preparation
James Thom & Dorian Leslie
(Report & Figures) 25.0 $100.00 $2,500.00
Other (specify)
$2,820.00 $2,820.00
Ground geophysics Line Kilometres / Enter total amount invoiced list personnel
Radiometrics
Magnetics Mag Rental and Operator (Matt Kootchin) $8,635.00
Gravity
Digital terrain modelling
Electromagnetics note: expenditures for your crew in the field
SP/AP/EP should be captured above in Personnel
IP field expenditures above
AMT/CSAMT
Resistivity
Complex resistivity
Seismic reflection
Seismic refraction
Well logging Define by total length
Geophysical interpretation
Petrophysics
Other (specify)
$8,635.00 $8,635.00
Geochemical Surveying Number of Samples No. Rate Subtotal
Drill (cuttings, core, etc.) $0.00 $0.00
Stream sediment $0.00 $0.00
Soil XRF analysis 350.0 $5.00 $1,750.00
Rock $0.00 $0.00
Water $0.00 $0.00
Biogeochemistry $0.00 $0.00
Whole rock $0.00 $0.00
Petrology $0.00 $0.00
Other (specify) $0.00 $0.00
$1,750.00 $1,750.00
Transportation No. Rate Subtotal
Barge Barge Crossing 2 trips 2.0 $250.00 $500.00
Airfare $0.00 $0.00
Taxi $0.00 $0.00
truck rental 10.00 $110.00 $1,100.00
kilometers $0.00 $0.00
ATV $0.00 $0.00
fuel $618.58
Helicopter (hours) 6 $998.00 $5,489.00
Helicopter Fuel (litres) 500.00 $1.95 $975.00
Other
$8,682.58 $8,682.58
Accommodation & Food Rates per day
Hotel 2 nights, 2 rooms @ 100 $0.00 $400.00
Camp Callinex Camp ( 3 men for 8 nights) 8.00 $707.25 $5,658.00
Meals Actual Cost $339.74
$6,397.74 $6,397.74
Miscellaneous
Telephone $0.00 $0.00
Survey Consumables
Sample Bags, Batteries, Bear
Spray, First Aid, Helicoper
Emergency Kit, Printed Maps $680.55
$680.55 $680.55
Equipment Rentals Weeks
Field Gear (Specify) Tents, Radios, GPS, Computers 1.00 $500.00 $500.00
Sat Phone Rental Rental + Minutes 1.00 $130.00 $130.00
$630.00 $630.00
Freight, rock samples
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL Expenditures $38,095.87
http://aris.empr.gov.bc.ca/ArisReports/33485.PDF