Welcome To the WIN!!! St. Elias Mines HUB On AGORACOM

Keep in mind, the opinions on this site are for the most part speculation and are not necessarily the opinions of the company WITHOUT PREJUDICE

Free
Message: Half a Year!
5
Jul 24, 2012 06:56AM
7
Jul 24, 2012 10:00AM

Can you believe it's been exactly one half of a year since the news on Jan 23, 2012, which this is a paragraph from:

Drill Hole TE-11-06 returned compelling initial results and, while additional drill testing is required, the Company is in the process of completely sampling Drill Hole TE-11-06 from 60m to 170m on minimum 1.5-metre intervals to more accurately define a potential, bulk-tonnage mineralized target. The interval from 90.6m to 128.5m in Drill Hole TE-11-06 assayed 0.74g/t Au over 37.85m, and includes 0.74m of 23.5g/t Au at 112.26m and 0.35m of 9.6g/t Au at 113.32m. These mineralized intersections have been interpreted to be related to widespread resistivity lows identified from the 2009/2010 Titan 24 Survey. This correlation has led management to utilize these Quantec resistivity lows zones associated with the known mineralized corridors to fine tune additional exploration targets for drilling.

So, where is this information/results? Where is all the information/results?

6 months to test from 60M to 170M? Maybe the labs are that busy? But then again, maybe NOT!

Share
New Message
Please login to post a reply