Welcome To the WIN!!! St. Elias Mines HUB On AGORACOM

Keep in mind, the opinions on this site are for the most part speculation and are not necessarily the opinions of the company WITHOUT PREJUDICE

Free
Message: Outragious!

I called Murray about two weeks ago and his answer to my question was that the drilling being performed by the two drills on site should be finished by about now.

The thing that surprised me was that if a deeper hole by one of the rigs was able to enter the anomaly and come up with good grades it would not be necessary to have the deep drill come in. At the Calgary meeting it was reported here that Lori said the results of the deep drill analysis should be completed by September. My conclusion to this is that the geological engineers have great faith in Quantec, and grid drilling sounds as if is becoming a thing of the past.

Share
New Message
Please login to post a reply