Re: sli facts FROM NEWS RELEASES
in response to
by
posted on
Feb 21, 2012 02:13AM
Keep in mind, the opinions on this site are for the most part speculation and are not necessarily the opinions of the company WITHOUT PREJUDICE
http://www.steliasmines.com/storage/news_releases/Sli-News-2007-32-FINAL.pdf
NEWS RELEASE
TESORO GOLD PROJECT, PERU
Mineralization Continues to Depth/Gold Grades Increase with Depth
Lori McClenahan, President Of. St. Elias Mines Ltd. (the “Company”), is pleased to provide the
following progress report on the underground and surface exploration activities at the Tesoro
Gold Project (the “Property”) located in southwestern Peru. To date, the Company has identified
five mineralized zones on the Property with more than 50 quartz veins (having a total combined
length of 9km) and has carried out underground exploration and development work on two of
these veins (C1 Vein and A4 Vein System.)
Zona Canchete
The shaft at the C1 Vein (previously referred to as the ZCV#1 Vein) has been deepened to the
80m level and the vein continues to be consistent and generally high grade. Currently, a short
drift is being completed to the east of the shaft on the 80m level in order that a
manway/ventilation raise can be installed between the 80m and 60m levels. The following assay
results have been received for face samples taken in the C1 shaft at 2m intervals between the
64m and 74m levels:
Sample
Shaft
Level
Width
(cm)
Sample
Type
Gold
(g)
Gold
(opt)
TV 23 64 87.00 channel 23.30 0.68
TV 24 66 30.00 channel 22.90 0.67
TV 25 68 5.00 panel 6.02 0.18
TV 26 70 14.00 channel 16.70 0.49
TV 27 72 3.33 panel 57.00 1.66
TV 28-29 74 13.50 panel 76.50 2.23 Page 2
ST. ELIAS MINES LTD.
News Release 2007-32 (October 23, 2007)
The C1 shaft will continue to be deepened to a planned depth of 100 meters below the surface.
The shaft is currently in a transition zone from oxide facies to sulphide facies. Two select
samples of massive sulphides were taken from approximately the 74m level in the shaft and
assayed for gold and other elements in order to see if the gold content increases, diminishes, or
remains the same in the sulphide-rich vein material relative to the oxide-rich material. Assay
results, listed below (both from the sulphide zone), indicate that the gold content increases in the
sulphide-rich material and that the material is also enriched with silver, copper and tungsten.
Sample
Gold
(g/t)
Gold
(opt)
Silver
(g/t)
Silver
(opt)
Copper
(%)
Tungsten
(%)
TV 835 110 3.21 83.6 2.44 5.59 0.13
TV 836 127 3.70 26.1 0.76 0.31 0.19
The C1 Vein (ZCV#1) is only one of eight gold-bearing quartz veins located at Zona Canchete.
Systematic trench sampling of the C2 Vein at Zona Canchete is presently underway. Additional
surface sampling and trenching on other veins located at Zona Canchete (C3-C8 Veins) is
planned in order to identify additional veins warranting underground development.
Zona Central
The Company is in the process of extracting two high-grade gold-bearing pods from the A4 Vein
System at Zona Central, one in the shaft between the 8m and 31m levels, and another on the 42m
level. Results of these bulk samples will be used by the Company as a guide to determining
optimum spacing for diamond drilling. Additional underground development at the A4 Vein
System will be carried out after the completion of a systematic drilling program.
Zona Central is comprised of five gold-bearing quartz veins and three additional vein swarms.
Systematic trench sampling of the A1 Vein at Zona Central is presently underway. Additional
surface sampling and trenching on other veins located at Zona Central (A2, A3 and A5 Veins) is
planned in order to identify additional veins warranting underground development.
Camp Expansion
The Company has recently installed six additional prefabricated buildings on the Property (two
warehouses, one kitchen, one dormitory and two offices.) The buildings range in size from 12 to
45 square meters. The camp is being expanded to accommodate additional personnel in
preparation for future mining on the C1 Vein. In addition, more personnel are required for a
night shift on the drill, for detailed trenching of veins, and for possible future underground
development of additional veins.