Sculpin, further to your post, with drill holes 7 & 8, and T18 & T14. I know at times it's mentioned, enough Math, however, many more also say the more info the better. So, here comes a little more math, and if you choose, it's easy not to read & move to the next post.
The original plan, there was only 2 High Priority drill holes planned for Zona Canchete, they were H25 & H26. Now, this is assumptions now only (from the work that Hog & Sculpin were doing, and I do agree):
H26 (assume is Hole 8, which was drilled 330M in Canchete, 9 intercepts reported) into T14
H25 (assume is Hole 7, which was drilled 380M in Canchete, 11 intercepts reported) into T18
Lets now look at T14 & T18, from the 43101 report, and what Quantec had to say about them.
We'll do some Math, with the dimensions from the report, and @ 0.3g/T, and NO scaling
T14
From L4750 to L6000 & From 550E to 1050E & Depth of 350M
1250M X 500M X 350M X 2.75T/M3 X 0.3g/T X 1OZ/31.1g
5.80 Million OZ, if the average throughout that anomaly is 0.3g/T
T18
From L5500 to L6250 & From 1150 to 1750E & Depth of 350M
750M X 600M X 350M X 2.75T/M3 X 0.3g/T X 1OZ/31.1g
4.18 Million OZ, if the average throughout that anomaly is 0.3g/T
Going back to that 43101 Report, we continually learn more & more!