Oh ok, she told me when we get enough drili holes to be representative of something. It didn,t necessarily mean all of the shallow phase 1 drilling. Then I heard her say from the AGM audio, (i believe thats where) that results would be released when phase 1 was complete and compiled. The problem with those words, are that it is still not clear what she meant, and could be interpreted as a contradiction to each other.
So if we look at the phase 1 shallow drilling needed to be finished, like you say. We should have been at that point around Dec 1st. But when I did the math back on how many meters a day, it worked out to only around 20m per day being drilled, this not make sense to me for us to be that slow in a flat land and an oxidized zone of 50m from the surface down.
The problem is, we can,t get any straight answers on how she is gonna release results and how much drilling we have done. I can,t even find out where we are currently drilling. Everthing is secret, but shareholders have a right to know these simple things, they are not considered inside trading.