No such message found

Welcome To the WIN!!! St. Elias Mines HUB On AGORACOM

Keep in mind, the opinions on this site are for the most part speculation and are not necessarily the opinions of the company WITHOUT PREJUDICE

Free
Message: Lots of results to come soon

We must have over 2000 trench samples to come.

Multiple bulk samples?

8-10 drill holes.

Results from last years exploration of sampling and trenching.

It is anticipated that an additional 20 Peruvian nationals will be hired to support the drilling program. Drilling activities a are scheduled to run in two shifts, 24 hours per day, seven days a week until the program is complete.

As at May 31, 2011, 15 trenches totalling 1,200 linear metres have been completed with 215 samples collected over 5m sample intervals from the trenches at the Tesoro Project. The trenches were completed by a backhoe and a track-mounted excavator at Zona Central (Main Structural Corridor) and Zona Este (Parallel Structural Corridor).

http://steliasmines.com/newsrelease/diamond-drilling-tesoro-gold-project-in-peru/

There should be some nice presents to come !

Share
New Message
Please login to post a reply