I have been waiting for over a year on the results of the bulk sample taken from the C-3 vein. Were these results released and I missed them? It would appear by this NR that turn around times for bulk samples are rather quick, 2-3 weeks.
http://www.steliasmines.com/storage/news_releases/Sli-News-2010-15-Tesoro-FINAL.pdf
The Company is now taking a bulk sample from the C3 Vein at Zona Canchete, which is a
narrow but high-grade (+- 1.0 oz/t gold) vein paralleling the C1 Vein, which has been described
in previous news releases (average grade of 0.99 oz/t gold based on milling of 451 tons of bulk
sample.) The grade of the bulk sample from the C3 Vein should be available within the next two
weeks.
So, if there have been bulk samples taking from the trenching which began May 19th with over 1000m completed by June 1st, is it possible to have results back now from some of them?