All we need and what I would like to see, is about 10 drill holes scattered all over the property to get the best representation of the various targets. The monster anomaly only needs about three holes to start, and where this almost breaches the surface to the south of the A-4 MINE, 3 holes of 200-400mm would suffice for now. If we get a lowball offer at this point, sink these holes down to 1000m. I have showed in the last few days where the Chorunga complex to the south has mined those vein down to 1000m with high grade. I have showed where , to our immediate north, Dynacors veins extend and have been traced approx 1300m below our surface with grades of around 16 g/t. So , to me the deep is almost proven by this along the Main Corridor which connects to Dynacor in the north and Chorunga in the south.
We have a truck load of info from the main corridor holding most of the monster anomaly, A-4 and C-1,2,3,4, AND 5 veins. What we need is new info from the rest of the property, particularily the targets identified by the Quantec. As far as I,m concerned, we should be focusing 3/4 of our efforts on these new targets, we already know what most of the Main Corridor holds, and to spend too much time there right now, would be a waste of time if a quick offer is expected to arise.
AGAIN, IMO.