Murry told me some time ago that they were no longer able to remove surface samples for processing without the permit. They have been stock piling on location. We should see a flood of new information when they get those samples processed. Should be about a month from now. Lets hope the drilling rigs are on site and hard at it by then as well.
Let the party begin.
Ook