These shallow tagets they speak of here can be drilled in less than a week. If the company comments on visuals, its possible to have the visual reports 2 weeks after we start drilling.
My timelines may have to be moved closer if they do this.
The 2011 drilling program at the Tesoro Gold Project will commence as soon as possible. The program is being designed to test near surface and deeper geophysical anomalies identified by the Titan 24 geophysical survey.The drilling program will consist of 10,000 metres of diamond drilling with holes down to depths of up to 1,500 metres.