I am wondering re the great results from the Quantec survey on our flagship property compared with a drill plan on Vicaro. Is it the size that makes the geologist turn to one method over "semi-blind" drilling? I realize that the cost of the geophysical survey must equal a shallow drill hole, but the pockets of conductivity etc. that Hog shows near the workings dictate the place and angel of drilling so dramatically. Also SLI deserves a discount!