Welcome To the WIN!!! St. Elias Mines HUB On AGORACOM

Keep in mind, the opinions on this site are for the most part speculation and are not necessarily the opinions of the company WITHOUT PREJUDICE

Free
Message: Huge Calculation Errors

Boy did I ever screw up. Sorry folks, let me try this simple math again, this time doing it correctly:

Veeblue method yields 4.66M m3

Ellipse formula yields 2.1 M m3 (4/3 * 3.14 * 900m * 850m * 650m)

Cube method yields 4.0 M m3 (1800m * 1700m * 1300m)

Vee, your method says the anomaly holds slightly more volume than it would if it were a perfectly shaped rectangular cube - I think that's what Geer is questioning.

Anyways, using the ellipse formula further:

2.1 M m3 * 2.5 t/m3 * 1 g/t * 1oz/31.1g = ..........167 M oz

At $20/oz for gold in the ground and 115M shares, that's $29/share. That's more like it. Increase the average grade to 5g/t, or, increase gold in the ground to $100/oz, and you're at $150/share. Increase both and.........I'll stop there.

Share
New Message
Please login to post a reply