I'll calculate One 1st Priority Target per day for the next 18 days (by then, we have to have the Permit)
There are 19 Targets, but T19 does not have any drill holes planned inside it. Also Drill Holes H2, H3, H4, H6, & H8, are not inside a Target.
The Ovoid formula will be used (which automatically scales everything in half), I'll use 5g/T (seems pretty realistic), and I'll Scale back & divide all the answers by 2, just so things don't look too big.
Day #1 = Target #1 (Drill Hole H1):
4/3 X 3.14 X 1/8 X 250M X 300M X 400M X 2.5 T/M3 X 5 g/T X 1 OZ/31.1g
6.31 Million OZ
Scaled Back Result = 3.16 Million OZ