Dear shareholder,
Thank you for you inquiry. The two main access roads north of Highway 11; Highway 801 and the Kinghorn Road have both had a number of washouts during the spring summer period. These washouts have been repaired. Sage had constructed a winter road into the eastern side of Jacobus which was used for winter stripping activities. Sage is currently constructing a summer road into the eastern side of Jacobus in order to move in heavy equipment for stripping and trenching activities.
Regards,
AGORACOM Investor Relations