Re: PRB SE Deposit Model and Estimate
in response to
by
posted on
Apr 11, 2013 11:03AM
Mark
An excellent post and graphic. Bully!
Assuming the patent claims aquisitions, (long under negotiation per PRB releases); and sections 1800 and 1900 (two holes per section already drilled, assays pending per NR just released)...... assay report is equal or better than the reported drill results in section 1700 holes (Two);.... and tba (soon, as reported) metallury re-confirms already reported 90-92% recoverability results, would you change your estimates??
I think the above info could be released prior to Apr 21. Do you?
Peter