Message: Opinion

Looking at the cross section I think bl10-2 should be revisited and drilled to depth... untill it runs out of structure. The grade increases at depth. If it continues to increase at depth the resource will grow exponentially.

BORDEN LAKE -- SELECTED DRILL HOLE ASSAY INTERVALS

DDH From (m) To (m) Width (m) Au (g/t)

BL10-02 4 23 19.0 0.4
BL10-02 37 128 91.0 2.0
iIncluding
BL10-02 73 84 11.0 3.5
also including
BL10-02 91 112 21.0 3.2
including
BL10-02 106 111 5.0 5.3