I am having a hard time trying to interpret the latest news release.Will the grade be adequate and economical at this stage?Will someone please shed some light on this?
Grades around 1g/t over significant lengths (70-100m) with some higher grade sections (3-14 g/t) within open-pit depths (27-200m) can form a bulk tonnage deposit which most likely would be economical (there are quite a few bulk tonnage mines out there operating below 1g/t).
This will be all about tonnage, tonnage, tonnage.
FANTOMAS