Probe originally planned to drill 8 holes (4 drills for chrome and 4 drills for Ni/Cu) for a total of 2,100 metres. Actually 9 holes were drilled for a total of 2,249 metres. By the time that the NR was out, I believe drilling at 9th hole was not finished by July 27th. Dave planned to back and finish it. There might be something else that was not reported in the previous NR. Along with assay results, I'd like to hear a brief of the Phase II drilling plan.