They are drilling first on the outcrop because all they need is shallower holes there similar to Eagle 1 which would also be MMS deposit.Plus DP likes to drill from one side to other rather than bouncing around.
Victory on the other hand so far , from the hole that they are waiting for are VMS.So they are different animals.
That they are still there is a very good sign as it takes the drillers about 1 1/2 days to drill about 160 meters.
The other of probes anomaly on the east side of the property they will be drilling maybe 500 or 600 meters which would take about 5 days to drill.
If you see some of this information is wrong feel free to correct me.