Clarence Stream
posted on
Nov 10, 2010 06:16AM
Joint venture with Cliffs Chromite Ontario Inc.
SAINT ANDREWS, NEW BRUNSWICK--(Marketwire - Nov. 9, 2010) -
Highlights:
-- 45 hole (8,400 m) diamond drill program completed; assay results from
the balance of the holes expected to be released within the next 4 weeks
-- Portage to earn 60% interest by meeting $1.6 million expenditure by
November 15, 2010 is on track
-- Gold bearing alteration system expanded by 3 times to approx. 800 m
length (up to 350 m width); new parallel gold trend discovered on the
west
-- Initial drill results yielded significant gold mineralization including
1.29 g/t gold over 74.0 m and 1.21 g/t gold over 25.0 m in holes 37 and
22 respectively
-- Drilling is evaluating the project's large tonnage, open pit potential
-- GR-99-005: 23.0 metres grading 1.13 g/t Au (75.4 ft @ 0.033 oz/ton)
-- GR-99-010: 5.3 m grading 4.85 g/t Au (17.4 ft @ 0.141 oz/ton)
-- GR-04-011: 19.9 m grading 2.26 g/t Au (65.3 ft @ 0.066 oz/ton)
-- GR-04-013: 28.0 m grading 1.07 g/t Au (91.8 ft @ 0.031 oz/ton)
-- GR-04-014: 33.2 m grading 1.43 g/t Au (108.9 ft @ 0.042 oz/ton)
-- GR-04-015: 29.4 m grading 1.71 g/t Au (96.4 ft @ 0.050 oz/ton)
-- GR-04-017: 14.3 m grading 1.35 g/t Au (47.1 ft @ 0.039 oz/ton)
-- 1.29 g/t gold over 74.0 m including 3.39 g/t gold over 10.0 m and 35.00
g/t gold over 1.0 m obtained in drill hole GR-10-37;
-- Hole GR-10-22 which was drilled 50 meters south of GR-04-15 (1.71 g/t
gold over 29.4 m) returned 1.21 g/t gold over 25.0 m including 1.95 g/t
gold over 6.0 m.
----------------------------------------------------------------------------
GOLDEN RIDGE DRILL INTERSECTIONS(2)
----------------------------------------------------------------------------
Interval
From To (metres) Au
Hole No. Coordinates Dip Azimuth (metres) (metres) (1) (g/t)(2)
----------------------------------------------------------------------------
GR-10-20 L200N, -45 Grid 55.00 104.00 49.00 0.64
412.5W degrees East
(115 including 69.00 14.00 1.35
degrees) 55.00
and 88.00 7.00 1.07
81.00
and 101.00 2.00 1.185
99.00
----------------------------------------------------------------------------
GR-10-22 L050N, -45 Grid including 24.00 2.00 1.825
387.5W degrees East 22.00
(115
degrees) 112.00 148.00 36.00 0.97
or 137.00 25.00 1.21
112.00
including 121.00 6.00 1.95
115.00
and 137.00 4.00 1.71
133.00
----------------------------------------------------------------------------
GR-10-24 L050N, -45 Grid 156.00 181.00 25.00 0.74
600W degrees East
(115 including 158.00 2.00 1.45
degrees) 156.00
(i)Hole 24
mineralization and 169.00 7.00 1.21
represents a new, 162.00
parallel zone
174.00 181.00 7.00 1.00
195.00 198.00 3.00 1.40
----------------------------------------------------------------------------
GR-10-25 L300N, -45 Grid 12.00 19.00 7.00 2.07
337.5W degrees East
(115 61.00 62.00 1.00 1.72
degrees)
70.00 72.00 2.00 0.94
----------------------------------------------------------------------------
GR-10-37 L150N, -45 Grid 70.00 144.00 74.00 1.29
650W degrees East
(115 126.00 127.00 1.00 35.00
degrees)
(i)the new, 131.00 141.00 10.00 3.39
parallel zone
100m north of
hole 24
------------------------------------------------
Note: Hole 37 intersection includes a 35.0 g/t
gold value over 1.0m, which is being check
assayed
----------------------------------------------------------------------------
(1)Intervals are core length. True width will be defined with additional
drilling
(2)Assays performed by Activation Laboratories Ltd, Ontario using the fire
assay method (A3-50) on 50 grams of prepared sample and/or INAA
(1H (Au+48)). All INAA assay results are greater than 500 ppb gold have been
also analyzed using the fire assay method.