The recent photo of cores is from last week at HM. The quote is from a 2012 NR, simply to verify that a five row core box = ten feet of drilling.
Last week's photo represents 120 feet of drill depth and appears to have intersected one or more layers of Rock with, perhaps, intervals of overburden . . . . this might be an example of the "folding" JB mentioned to me a long while ago. I think JB was concerned with the extent or width of possible folding, and it appears to me in this photo that perhaps such is not excessive.