From the Red Rock Canyon Update of Sept. 13-
"The archeological study is scheduled to begin September 13th while the native plant survey work is underway and should be completed around the middle of the month." (However, as, I believe, KO pointed out- exactly which month was never specified)
"Our drilling contractor will obtain the required permits within that timing. If all goes well, we may begin drilling as early as November."
So- I guess excitement must be building in anticipation- except--as of 10:30 am there is no volume and a plummeting PPS- thankfully just stagnant at the moment.
Are we on track? Or has someone pulled the switch and we are on another track? Or are we off the tracks altogether?
I think another "update" is in order. Are we really are just weeks away- if so, there should be some buzz and a flurry of preparatory activity. Is this happening? (But I will just mention- that maybe- if we are on another track- there may still be time to switch and head over to Hay Mountain.)
So- are we moving ahead as touted? Or not.