Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Gold Bullion Development (GBB, TSX-V)

with all due respect rockstar you must do some dd,,,,,if your waiting for stellar assay grades your in the wrong company,,,,gbb is after low grade high tonnage,,,its that simple,,,

Share
New Message
Please login to post a reply