Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Gap filled

Looks like to gap to .57 need to be filled, now with that out of the way lets move up

Please LOL

Share
New Message
Please login to post a reply