Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: Re: My Guess When First Round Of Assays From Phase 2 Drilling

my best guess would be wednesday, everyone back from holidays, hopefully market has settled a little bit. today looks like a very healthy pullback which i think is great before news, think we have a better chance of soaring on news instead of a sell of that probably was going to happen if it kept going at the rate that it was. and i am also going to guess that results are better than phase one,,based on nothing but conecting the dots,,,could be way off but hope not,,,

Share
New Message
Please login to post a reply