Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: I spoke with Mr. Thomas

Well that explains some of the run yesterday. Thanks for the update, that is great.

If he is back on Sat I would think he is expecting some results shortly after that.

It always takes longer than a person thinks.

Take care

Share
New Message
Please login to post a reply