I'll take a stab at it:

Review the NR from April 17, 2007, especially the Northern BC Ethanold Facility:

April 17, 2007

Winfi eld Resources Limited

Suite 600 – 666 Burrard Street

Vancouver, B.C., V6C 2X8 Canada

T: 604.895.7463 | F: 604.688.1320

E: foley@winfi eldresources.com

WWF-TSXV

APRIL REVIEW

ZARZIS, TUNISIA

WINFIELD, Represented by President Robert Michael Foley and Mr. David McClement, P.Eng. consulting Engineer. attended a

site inspection at the Port of Zarzis, Tunisia. the WINFIELD delegation was met by three levels of government each keen to see

our ambition to build, own and operate a new 300,000 barrel per day oil refi nery succeed. Contingent to regulatory acceptance

WINFIELD has arranged 100% debt fi nancing subject to certain performance covenants. WINFIELD is now awaiting approval from

the Tunisian High Authority to build, own and operate a new 300,000 barrel per day oil refi nery.

TRIPOLI, LIBYA

WINFIELD, Represented by President Robert Michael Foley and Mr. David McClement, P.Eng. consulting Engineer. attended a site

inspection at the port of Azawiya, Libya. The WINFIELD Delegation made its presentation to Build, Own and Operate a 300,000

barrel per day oil refi nery in the ZAWARAH Tax Free Zone. WINFIELD is now following up with a formal application in accordance

with Libyan Regulatory compliance. WINFIELD also wishes to announce that it has expanded its corporate registration to INCLUDE

LIQUID Natural Gas [lng], Co-Generation Facilities and Desalination Facilities; this is in addition to our original registration allowing

for WINFIELD to engage in the EPCM of oil refi neries.

HIGH LEVEL ALBERTA ETHANOL – FEEDLOT FACILITY

WINFIELD is in possession of a full feasibility report from TDI TECHNOLOGY on a proposed new 20 million litre per year integrated

ETHANOL – FEEDLOT Facility. WINFIELD is now engaged in the fi nancing PHASE AND is seeking 100% debt fi nancing. The TDI

design is based on A PREVIOUS TDI commission at Poundmaker, Saskatchewan that has had returns of 25 to 33% per year for the

previous 15 years.

NORTHERN BRITISH COLUMBIA ETHANOL FACILITY

WINFIELD’s consultancy, TDI TECHNOLOGY INC., .has expanded its scope and is NOW REVIEWING three distinct approaches to

deriving fuel ethanol from wood waste. The winning licencee will PROVIDE the highest yields per dry ton and lowest costs per litre

to produce fuel ethanol from woodwaste. WINFIELD will then engage TDI TECHNOLOGY INC., to prepare a full Feasibility Report

on a wood waste to ETHANOL Facility for a NORTHERN BC location. Project fi nance is in place pending acceptance of the full

feasibility report.

EAST AFRICA

WINFIELD’s application for a non refundable Grant to fi nance a renewable sustainable fuel ETHANOL Facility using indigenous feed

stocks has attained fi rst stage approval. Final approval awaits the consent of the Rwandan Government. WINFIELD is seeking

fi nance to build a 45 million litre per year fuel ETHANOL facility. Existing facilities of this size or greater are currently in commercial

production in Thailand.

On behalf of the Board

Robert Michael Foley

President and CEO

For further information please contact:

BADSHAH COMMUNICATIONS

604.408.7522 | anwar@badshahcommunications.com

THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT

RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.


Nov 06, 2007 12:17PM

Nov 06, 2007 12:56PM

Nov 06, 2007 01:09PM

Nov 06, 2007 02:32PM

Nov 06, 2007 02:33PM
1
Nov 06, 2007 03:50PM

Nov 06, 2007 04:10PM
Share
New Message
Please login to post a reply