The Pelangio 3 hole program was a total of 700 meters but the project area is NOT at all directly on-strike with the Lakeshore mine trend which follows an ultramafic body running to the north-west of the Pelangio corridor. Any I.P. conductors drilled on the Pelangio ground came up empty and all possible future drilling returns would have to be based on now very deep holes which geophysics cannot detect too.
The latest WTM Thunder Creek zone is also running on a strike orientation to the south-west and away from both the Pelangio and Lakeshore ground