METALEX/WSR commence drilling
posted on
May 14, 2008 08:45AM
Aggressive program in a highly prospective portion of the "Ring of Fire" mineralized zone.
Metalex/WSR commence drilling for base metals in James Bay Lowlands
Wednesday May 14, 12:31 pm ET
The first target for which ground geophysical results were available is presently being drilled. Metalex Geologist, John Churchill, reports that this 60 degree inclined hole, being drilled towards the ground electromagnetic anomaly, is at about 60 metres depth. The final target depth of the hole is 235 metres. Another 60 degree inclined hole is planned to be drilled from the opposite side of this ground electromagnetic anomaly.
Should potentially economic sulfides be intersected in either of the holes, a second drill rig presently at the Richards Lake camp will be used to delineate the resource. The small exploration core rig will be moved to drill 15 additional anomaly targets in which ground geophysical surveys have been completed.
Geologists from Metalex and WSR are most encouraged by both the quality and quantity of air and ground sympathetic geophysical anomalies obtained to date, and look forward to favourable drill intersections.
Dr. Charles Fipke is the Qualified Person responsible for the technical contents of this press release.
John Tait John Tait President & CEO