Copper-zinc exploration in the Flin Flon-Snow Lake VMS Belt

Recent Results Include 6.69% Copper Over 71.69 Metres and 3.74% Copper Over 21.77 Metres

Free
Message: Holes pending

Holes pending

posted on Mar 31, 2008 08:19PM

DRILLHOLE INTERVAL DETAILS

DRILLHOLE

FROM

(M)

TO

(M)

INTERVAL*

(M)

DESCRIPTION

RD-08-21

-

-

-

No Sulphide

RD-08-22

96.89

122.64

25.75

NSS

RD-08-23

-

-

-

No Sulphide

RD-08-24

-

-

-

No Sulphide

RD-08-25

-

-

-

No Sulphide

RD-08-26

61.70

82.85

21.15

NSS

inc

66.28

69.84

3.56

NSS

and

121.85

133.90

12.05

NSS

inc

127.70

133.90

6.20

NSS

RD-08-27

-

-

-

No Sulphide

RD-08-28

-

-

-

No Sulphide

RD-08-29

135.00

164.25

11.25

NSS

RD-08-30

136.70

159.38

22.68

NSS

RD-08-31

-

-

-

In Progress

RD-08-32

-

-

-

No Sulphide

RD-08-33

Sulphide Veinlets

RD-08-34

167.92

203.65

35.73

NSS


From the above holes I beleive we have #29,30, and 34 pending of course # 31 in progress.

What is meant by a sulphide veinlet?

Does anyone have a link for mapping GPS coordinates?

Thanks in Advance

Share
New Message
Please login to post a reply